What was found
CRACK AT AFT HOLE ON INTERCOSTAL; BS 344-360; LBL 6; WL 208.<[01] AFTER FURTHER INVESTIGATION FOUND CRACK AT AFT HOLE ON INTERCOSTAL BS344-BS360 LBL 6 WL208 TO BE LOCATED AT AFT HOLE ON INTERCOSTAL BS344+9.5 LBL11; WL 208.1;[02] REMOVED INTERCOSTAL FROM BS344-BS360 LBL11 IAW SRM 51-40-02;[03] VERIFIED CORRECTIVE ACTION 1 AND 2.;[04] LOCATED AND DRILLED NEW INTERCOSTAL P/N#141A5410U148 FROM BS344-BS360 LBL11 IAW SRM 51-40-02 AND PER DWG#141A5400. OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION 4. OK TO INSTALL;[06] INSTALLED NEW INTERCOSTAL P/N#141A5410U148 FROM BS344-BS360 LBL11 IAW SRM 51-40-02 AND PER DWG#141A5400.;[07] RII;VERIFIED CORRECTIVE ACTION 6.;[08] TASK IS COMPLETE.