What was found
CRACK ON STRINGER S-25L TERMINUS. STA 540<[01] VERIFIED APPLICABILITY OF SRM 53-00-03-2R-1 REP.1.;[02] REMOVED DAMAGED SECTION OF STRINGER 25L BS 500D+11'-540 IAW SRM 53-00-03-2R-1 REP. 1 PAR. 4-B.;[03] PERFORMED GVI ON REPAIR AREA AND NO ADDITIONAL DAMAGED FOUND IAW SRM 53-00-03-2R-1 REP. 1 PAR. 4-B(1).;[04] VERIFIED CORRECTIVE ACTION 1;2 AND 3.;[05] ACCOMPLISHED HFEC SURFACE SCAN OF CUT EDGE IAW 737 NDTM PART 6 CHAPTER 51-00-00 PROCEDURE 23. NO CRACKS NOTED.<BR><BR>EQUIPMENT USED: NORTEC 600 ID: ATS1465 CAL DUE: 09/2023;[06] RECEIVED NEW STRINGER SECTION S-25L FROM OSS RO. 917124-SWA-3 IAW SRM 53-00-03-2R-1 REP. 1 PAR. 4D.;