Service difficulty report · Angle · Boeing 7378H4

Difficulty date
May 4, 2023
Submitted
May 25, 2023
Operation
Air carrier
Aircraft
N8670A
Make and model
Boeing 7378H4
Aircraft serial
36656
Aircraft time
27,016 hours, 12,741 cycles
Part
Angle
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO LH FLOOR TRANSITION ANGLE (SIDEPLATE CHANNEL) HAS CORROSION IN NUMEROUS AREAS ON AND AROUND FASTEN HOLES STA-747 TO 787 (MARKED)<[01] BLENDED OUT CORROSION AT L/H TRANSITION ANGLE STA 747 TO 787; LBL 21 PER REF. SRM 51-10-02. REMAINING MATERIAL THICKNESS OUT OF LIMITS PER SRM 53-00-53-1A-2.;[02] BLENDED OUT CORROSION AT L/H TRANSITION ANGLE STA 747 TO 787; LBL 21 PER VERIFIED REF. SRM 51-10-02. REMAINING MATERIAL THICKNESS OUT OF LIMITS PER SRM 53-00-53-1A-2.;[03] REMOVED FASTENERS FROM L/H TRANSITION ANGLE FROM STA 747 TO STA 787 PER SRM 51-40-02. CUT AND REMOVED L/H TRANSITION ANGLE STA 727+12? TO STA 787+12? PER SRM 53-00-53-2R-5.;[04] FABRICATED REPAIR PARTS OUT OF FORM CHANNEL BAC1496-377 7075 T62 PER SRM 53-00-53-2R-5.;[05] INSPECTED WORK ABOVE;[06] TREATED FABRICATED REPAIR PARTS PER SRM 51-20-01 AND PRIMED PER SOPM 20-41-02.;[07] INSTALLED BONDED NUTPLATES ON REPAIR PARTS PER SRM 51-40-10 AND SOPM 20-50-12. <BR>NUTPLATES INSTALLED AT 0430 CT 13-MAY-2023;[08] VERIFIED THE INSTALLATION OF NUTPLATES AND PREP OF REPAIR PARTS PER SRM 51-40-10 AND SOPM 20-50-12.<BR>NUTPLATES INSTALLED AT 0430 CT 13-MAY-2023;[09] INSTALLED REPAIR PARTS PER SRM 53-00-53-2R-5.;[10] C/W INSPECTION STEP #9;[11] ACCOMPLISHED PUSH TEST FOR BONDED NUTPLATE INSTALLATION I.A.W SRM 51-40-10-2R-0. SEE WORK STEPS FOR WORK ACCOMPLISHED.

More about the Boeing 737-8H4