Service difficulty report · Support · Boeing 7377H4

Difficulty date
May 2, 2023
Submitted
June 1, 2023
Operation
Air carrier
Aircraft
N961WN
Make and model
Boeing 7377H4
Aircraft serial
36962
Aircraft time
37,902 hours, 23,158 cycles
Part
Support
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FLOOR TO SIDEWALL SUPPORT AT STA 500A+2; 500A+6.5; 500A+10.5; 500A+13.5; 500A+14.5; 500A+19; 500B+6; 500B+10; 500C+10; 500C+14; RBL 24; WL 156.<[01] COMPLETED STEPS 1 THRU 10;[02] USED CALIBRATED TOOL # ATS 1737 DUE DATE 08/2022;[03] VERIFIED CORRECTIVE ACTIONS 1 AND 2.;[04] REMOVED FLOOR TO SIDEWALL SUPPORT AT STA 500A TO 500D PER SRM 51-40-02;[05] FABRICATED NEW SIDEWALL SUPPORT PER DWG# 143A7501 AND TREATED PER SOPM 20-41-02 OK TO PRIME;[06] MATERIAL ID BAC1496-444#7075T62 LOT #1520195-1;[07] VERIFIED CORRECTIVE ACTION OK TO PRIME;[08] PRIMED NEW PART IAW B737-700 SRM 51-20-01 OK TO PAINT;[09] VERIFIED CORRECTIVE ACTION ITEM 8. OKAY TO APPLY TOPCOAT GIVEN.;[10] APPLIED TOPCOAT IAW AMM 51-21-00;[11] OK TO INSTALL FLOOR TO SIDEWALL SUPPORT BETWEEN BS 500A - BS 500D RBL24 WL 156.;[12] VERIFIED CORRECTIVE ACTION 11 AND MEASUREMENT TABLE<BR>OK TO INSTALL FLOOR TO SIDEWALL SUPPORT GIVEN;[13] INSTALLED FLOOR TO SIDEWALL SUPPORT BETWEEN BS 500A - BS 550D; RBL24; W 156 IAW B-737-700; SRM 51-40-02 DWG# 143A7500.;[14] VERIFIED CORRECTIVE ACTION 13;[15] VERIFIED JOB COMPLETE

More about the Boeing 737-7H4