What was found
CORROSION AFT CARGO BAY SHIELD AFT OF CARGO DOOR HAS MULTIPLE AREAS AROUND NUT PLATE HOLES BS847 TO BS867 RBL22 WL163.5<[01] CORROSION ON SHIELD WAS FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS ARE GIVEN IN THE SRM.;[02] VERIFIED CORRECTIVE ACTION 1- OUT OF LIMITS.;[03] REMOVED DAMAGED ACB SHIELD AFT OF CARGO DOOR BS847 TO BS867; RBL22; WL163.5 PER SRM 51-40-02-0G-0.;[04] LOCATED AND DRILLED NEW ACB SHIELD AFT OF CARGO DOOR PER DWG 146A0081 AND SRM 51-40-05-0G-0. OK TO INSTALL.;[05] VERIFIED CORRECTIVE ACTIONS STEP 4.;[06] OK TO INSTALL GIVEN.;[07] INSTALLED ACB SHIELD AFT OF CARGO DOOR BS847 TO BS867; RBL22; WL163.5 PER DWG 146A0081 AND SRM 51-40-02-0G-0.;[08] VERIFIED CORRECTIVE ACTION 7.;[09] VERIFIED MEASUREMENT TABLE.