What was found
CORROSION ON CLIP AT ACB BS727D+8 LBL5 WL152.<[01] EVALUATED CORROSION DAMAGE ON CLIP AT ACB BS 727D+8; LBL5 WL 152 FOUND TO BE OUT OF LIMITS DUE NOT LIMITS IN SRM PARTS WILL BE REPAIRABLE BY REPLACEMENT IAW SRM 51-10-02-0G-0;[02] REMOVED CLIP AT ACB BS 727D+8; LBL5 WL 152 IAW SRM 51-40-02-OG-0;[03] FABRICATED A CLIP AT ACB BS727D LBL5 WL152 FROM BAC1493-672#7075T62 LOT#1472647-1. TREATED IAW SRM 51-40-05 AND IAW DWG#146A7735. OK TO PRIME;[04] CORRECTIVE DWG# ON ITEM 3 ABOVE.....FABRICATED A CLIP AT ACB BS727D LBL5 WL152 FROM BAC1493-672#7075T62 LOT#1472647-1. TREATED IAW SRM 51-40-05 AND IAW DWG#146A7734. OK TO PRIME;[05] VERIFIED CORRECTIVE ACTION ITEMS 1; 2; 4.<BR>OKAY TO PRIME NEW CLIP GIVEN.;[06] APPLIED TWO LAYERS OF BMS 10-11; TYPE I PRIMER TO THE SURFACE OF NEW CLIP AT ACB BS727D LBL5 WL152 REFER TO SOPM 20-41-02.;[07] OK TO INSTALL;[08] VERIFIED CORRECTIVE ACTION 6 AND 7 OK TO INSTALL;[09] INSTALLED CLIP AT ACB BS727D+8 LBL5 IAW SRM 51-40-02 AND IAW DWG#146A7730;[10] VERIFIED MEASUREMENT TABLE;[11] VERIFIED CORRECTIVE ACTION 9