What was found
R/H VAPOR BARRIER HAS DISBONDED REPAIRS BS663 RBL 35 WL 178<[01] IDENTIFIED R/H VAPOR BARRIER IAW SRM 57-10-10-0I-2 TABLE 2; FIG 2; ITEM 4.<BR><BR>DAMAGE IS BEYOND ALLOWABLE DAMAGE LIMITS IAW SRM 57-10-10-1A-2 PARA 4.D (1).<BR><BR>DAMAGE WILL BE REPAIRED IAW SRM 51-70-04-2R-10 AS DIRECTED IAW SRM 57-10-10-2R-2 PARA 1.B.<BR><BR>REMOVED DAMAGED PLIES AND TAPER SANDED AREA IAW SRM 51-70-04-2R-10 PARA 4.A - 4.C; WITH NO CONTAMINATION NOTED.;[02] VALIDATED APPLICABILITY OF REPAIR TO BE COMPLETED IAW SRM 51-70-04-2R-10.;[03] VERIFIED CORRECTIVE ACTION 1 AND 2<BR><BR>VERIFIED MEASUREMENT TABLE;[04] FABRICATED REPAIR PLIES FOR FWD AND AFT SURFACES USING BMS 9-3 ST1581 LOT# 1526805-2 IAW SRM 51-70-04-2R-10 PARA 4.D.<BR><BR>OK TO INSTALL REPAIR PLIES.;[05] VERIFIED CORRECTIVE ACTION 4; OK TO INSTALL REPAIR PLIES.;[06] INSTALLED REPAIR PLIES TO FWD AND AFT SURFACES USING BMS 8-301 CL1 LOT# JH2EAA8895; VACUUM BAGGED REPAIR; AND COMPLETED SUCCESSFUL BLEED DOWN TEST ALL IAW SRM 51-70-04-2R-10 PARA 4.D & 4.E.<BR><BR>VACUUM GUAGE ID: ATS2441 / CAL DUE DATE: 08/2023;[12] RESTORED THE FINISH USING BMS10-103 PRIMER & BMS10-60 ENAMEL IAW SRM 51-70-04-2R-10 PARA 4. H. PER GENERAL REPAIR SECTION SRM 51-70-04-2R-0 PARA 4. P. <BR>R/H VAPOR BARRIER REPAIRED IAW SRM 51-70-04-2R-10;[13] VERIFIED CORRECTIVE ACTION 12;[14] VERIFIED CORRECTIVE ACTION 12