What was found
FORWARD CARGO BAY AFT SHIELD HAS AN ELONGATED FASTENER HOLE BS495 RBL22 WL 156<[01] ELONGATED HOLE ON SHIELD WAS FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS ARE GIVEN IN THE SRM.;[02] VERIFIED CORRECTIVE ACTION 1;[03] UPDATE TO CORRECTIVE ACTION STEP 1. ELONGATED HOLE ON SHIELD WAS FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS ARE GIVEN IN THE SRM; PART REPLACEMENT REQUIRED PER SRM 51-10-02;[04] REMOVED DAMAGED FORWARD CARGO BAY AFT SHIELD BS 492-500A RBL 22; LOCATED AND DRILLED NEW FORWARD CARGO BAY AFT SHIELD BS 492-500A RBL 22 IAW SRM 51-40-02-0G-0; SRM 51-40-05-0G-0 AND DWG 143A0080. OK TO PAINT.;[05] VERIFIED CORRECTIVE ACTION 4 AND MEASUERMENT TABLE.;[06] APPLIED TOPCOAT PER AMM 51-21-73-370-804 AS PER PREVIOUS ACCOMPLISHED ON EO. 5360-E-16462-NG.;[07] APPLIED TOPCOAT PER AMM 51-21-73-370-804 AS PER PREVIOUS ACCOMPLISHED ON EO. 5360-E-16462-NG. AND OK TO INSTALL.;[08] VERIFIED CORRECTIVE ACTIONS 6 AND 7.;[09] CORRECTION TO CORRECTIVE ACTION STEP 7; SHOULD STATE ' APPLIED TOPCOAT PER AMM 51-21-73-370-804 AS PER PREVIOUS ACCOMPLISHED ON EO. 5360-E-16461-NG ';[10] OK TO INSTALL GIVEN.;[11] INSTALLED FORWARD CARGO BAY AFT SHIELD BS 492 TO BS 500A RBL 22 WL 156 PER SRM 51-40-02-0G-0 AND DWG 143A0080;[12] VERIFIED MEASUREMENT TABLE.;[13] VERIFIED CORRECTIVE ACTION 11.;[14] VERIFIED CORRECTIVE ACTION 9.