Service difficulty report · Attach Angle · Boeing 7377H4

Difficulty date
May 25, 2023
Submitted
July 5, 2023
Operation
Air carrier
Aircraft
N962WN
Make and model
Boeing 7377H4
Aircraft serial
36963
Aircraft time
38,452 hours, 23,554 cycles
Part
Attach Angle
Part number
UNKNOWN
Condition
Cracked
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

B.S. 663 LOWER COMPOSITE BULKHEAD UPPER ATTACH ANGLE IS CRACKED AT R.B.L. 45; W.L. 165.<[01] PARTIALLY COMPLETED STEPS 1 & 2;[02] REMOVED BS 663 LOWER COMPOSITE BULKHEAD UPPER ATTACH ANGLE FROM RBL 6 TO RBL 63; WL 165 IAW SRM 51-40-02-0G-0;[03] RECEIVED NEW ANGLE FROM OSS PO NBR 922626 HFAB53-AN-002<BR><BR>LOCATED AND DRILLED NEW ANGLE PER REF SRM 51-40-02 AND DWG NBR 111A1322<BR><BR>OK TO APPLY CHEMICAL CONVERSION AND PRIME;[04] VERIFIED CORRECTIVE ACTION ITEM 3.<BR>OKAY TO APPLY CHEMICAL CONVERSION COATING AND PRIMER GIVEN.;[05] APPLIED CHEMICAL CONVERSION COATING AND PRIMER AT DISCREPANCY AREA PER REF SRM 51-20-01 AND SOPM 20-41-02;[06] VERIFIED CORRECTIVE ACTION 5;[07] OK TO INSTALL NEW ANGLE;[08] OK TO INSTALL NEW ANGLE;[09] INSTALLED B.S. 663 LOWER COMPOSITE BULKHEAD UPPER ATTACH ANGLE PER SRM 51-40-02-0G-0 AND DWG 111A1000;[10] OK TO APPLY CAP SEAL;[11] COMPLETED STEPS 1;2 AND VERIFIED INSTALLATION OF ALL FASTENERS EXCLUDING FASTENERS IN TANK. OK TO CAP SEAL EXTERIOR FASTENERS.;[12] INSPECTION OF STEP 2 NOT COMPLETED PARTIAL WORK FOR FASTENERS OUTSIDE TANK ONLY;[13] QC VERIFICATION OF FASTENER INSTALLATION INTERNAL TO FUEL CELL REQUIRED;[14] VERIFIED FASTENER INSTALLATION INTERNAL FUEL CELL FOR HORIZONTAL BRACKET.;[15] INTERNAL FASTENERS SEALED ON DAVCOR WORK ORDER 2311M460; SEE ATTACHMENT;[16] VERIFIED CORRECTIVE ACTION ITEM 15.;[17] UPDATED MEASUREMENTS SECTION FOR MATERIAL THICKNESS;[18] VERIFIED MEASUREMENT TABLE COMPLETE.

More about the Boeing 737-7H4