What was found
CORROSION FLOOR STRUCTURE FLOOR BEAM 986.5 AT RBL 43 WL 208.1 AT AFT GALLEY AREA 2023-378096<[01] EDDY CURRENT EQUIPMENT P/N: NORTEC500D; S/N: N500X12101V022235; DUE DATE: 03-AUG-23.;[02] TOOL USED P/N FPK-PRO-104 S/N PRO-3384 CAL DUE DATE 24 APR 23.;[03] PERFORMED PERMANENT REPAIR LOCATED ON FLOOR STRUCTURE FLOOR BEAM 986.5 AT RBL 43 WL 208.1 AT AFT GALLEY AREA .IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6. MATERIAL USED: STRAP 7075-T6 0.100? P.O: 2012 531818; ANGLE BAC1490-2887 P.O: 2023 124527; FILLER 7075-T6 0.150? P.O:2023 109423;[04] CORRECTED STEP 2: TOOL USED P/N: FPK-PRO-104 S/N PRO-3384 CAL DUE DATE: 24 APR 24.;[05] CORRECTED STEP 3:<BR>PERFORMED PERMANENT REPAIR LOCATED ON FLOOR STRUCTURE FLOOR BEAM 986.5 AT RBL 43 WL 208.1 AT AFT GALLEY AREA .IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6. MATERIAL USED: STRAP 7075-T6 0.100? P.O: 2012 531818; ANGLE BAC1490-2887 P.O: 2023 124527; FILLER 7075-T6 0.150? P.O:2023 109423. SEE INDIVIDUAL SIGN OFF BELOW;[06] CORRECTED STEP 3: <BR>PERFORMED PERMANENT REPAIR LOCATED ON FLOOR STRUCTURE FLOOR BEAM 986.5 AT RBL 43 WL 208.1 AT AFT GALLEY AREA .IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6. MATERIAL USED: STRAP 7075-T6 0.100? P.O: 2012 531818; ANGLE BAC1490-2887 P.O: 2023 124527; FILLER 7075-T6 0.150? P.O:2023 109423. RII SEE INDIVIDUAL SIGN OFF BELOW.