What was found
BS663 COMPOSITE VAPOR BARRIER BULKHEAD IS CRACKED AT WL 152; RBL 32.<[01] IDENTIFIED 663 BULKHEAD R/H VAPOR BARRIER MATERIAL IAW SRM 57-10-10-0I-2 TABLE 2 FIGURE 2 ITEM 4. DAMAGE AT DISCREPANT LOCATION EXCEEDS ALLOWABLE DAMAGE LIMITS IAW SRM 57-10-10-1A-2 PARAGRAPH 4.D(2). DAMAGE IS REPAIRABLE IAW SRM 57-10-10-2R-2 PARAGRAPH 1.C NOTE<BR><BR>REMOVED DAMAGED AND CONTAMINATED PLIES FROM DISCREPANT LOCATION AND CLEANED AREAS IAW SRM 51-70-04-2R-10 PARAGRAPH 4.A-C.;[02] VALIDATED REPAIR PER SRM 51-70-04-2R-10;[03] VERIFIED CORRECTIVE ACTIONS 1 AND 2<BR><BR>VERIFIED MEASUREMENTS TABLE<BR><BR>VALIDATED REPAIR PER SRM 51-70-04-2R-10;[04] FABRICATED REPAIR PLIES USING BMS 9-3H2 LOT#1526805-2 IAW SRM 51-70-04-2R-10 PARA 4.D.<BR>OK TO INSTALL.;[05] INSPECTED AND VERIFIED CORRECTIVE ACTION 4. OKAY TO INSTALL REPAIR PLIES.;[06] INSTALLED REPAIR PLIES USING BMS 8-301CL1 LOT#JH2EAA8895; VACUUM BAGGED; LEAK CHECK GOOD WITH VACUUM GAUGE ID:ATS2441 CAL DUE 08/2023 IAW SRM 51-70-04-2R-10 PARA 4.D-E.;[07] INSPECTED AND VERIFIED CORRECTIVE ACTION 6.;