What was found
L/W #1 TANK FWD BOOST PUMP UPPER BONDING JUMPER ATTACH POINT IS CORRODED ON FRONT SPAR<[01] SRM 57-20-10-1A-3 IS APPLICABLE TO THIS REPAIR.[08] PT INSPECTED AREA IAW SOPM 20-20-02. <BR>CORROSION NOTED WITHIN BLENDED AREA. MARKED AREAS. <BR>EQUIP USED: <BR>-RADIOMETER ID: ATS2504-A; B; C CAL DUE: 05/23;[09] REMOVED CORROSION ON MARKED AREAS IAW SRM 57-20-10-1A-3;[10] FLUORESCENT PENETRANT INSPECTION REQUEST AT REWORKED AREA TO ENSURE THAT THERE IS NOT OTHER DAMAGE IAW SRM 57-20-10-1A-3;[11] VERIFIED CORRECTIVE ACTION 9;[12] PT INSPECTED AREA IAW SOPM 20-20-02.<BR>NO CORROSION NOTED.<BR>EQUIP USED:<BR>-RADIOMETER ID: ATS2504-A; B; C CAL DUE: 05/23;REPAIRED L/W #1 TANK FWD BOOST PUMP UPPER BONDING JUMPER ATTACH POINT ON FRONT SPAR IAW SWA EA 23-157-01624 22. 09-JUL-2023 15:40 UTC. CORRECTION: ANGLE P/N:PART 654A0004-527, BN 211565 WAS NOT INSTALLED ON THIS AIRCRAFT.