What was found
CUSTOMER REQUEST - DEBONDED IB MAIN FLAP WEDGE PANEL LOWER SURFACE AT RT WING 2023-404776<[01] TOOL USED: CALIPER P/N:500-464 S/N:B17030933 DUE DATE: 17-OCT-23.;[02] TOOL USED: ULTRASONIC FLAW DETECTOR; P/N: EPOCH 650; S/N: 190984811 DUE DATE: 24-JAN-24;[03] TOOL USED: HOT BONDER P/N:HCS9200B-AV S/N:18175478 DUE DATE: 24-SEP-23;[04] TOOL USED: COATING THICKNESS GAGE: P/N:POSITECTOR 6000 NS3 S/N: 767584 DUE DATE: 02-AUG-23.;[05] PERFORMED INTERIM REPAIR ON I/B MAIN FLAP WEDGE PANEL LOWER SURFACE AT RT WING IAW B737-700 SRM 57-53-01-2R-18 REPAIR 18 AND REQUIRED TAP TEST INSPECTION EVERY 6;875 CYCLES OR 30 MONTHS. SEE INDIVIDUAL SIGNOFFS BELOW.;[06] TASK COMPLETED