What was found
AFT. CARGO L/H TRANSITION ANGLE LBL. 21 STA.727H+10 TO STA.807+10 HAS CORROSION IN SEVERAL AREAS.<[01] CUT AND REMOVED DAMAGED SECTION PER SRM 53-00-53-2R-5. SECTION OUT OF LIMITS;[02] C/W INSPECTION.;[03] REJECT: IN THE MEASUREMENTS SECTION; THE FOLLOWING ERRORS EXIST:<BR>1. THE 'REPAIR TYPE ()' SHOULD BE NOT BE LISTED AS N/A. <BR>2. THE 'CORRODED ELEMENT PART NUMBER ()' APPEARS TO BE INCOMPLETE.;[04] CORRECTED<BR>1. CHANGED FROM N/A TO MAJOR PER MPM 18.02.01.02<BR>2. COMPLETED CORRODED ELEMENT PART NUMBER TO ADD '-31';[05] FABBED; LOCATED; DRILLED; TREATED AND PRIMED PER SRM 53-00-53-2R-5;[06] 5. CARLOS OLVERA (TECHNICIAN); 12-JUL-2023 22:11 UTC<BR>FABBED; LOCATED; DRILLED; TREATED AND PRIMED PER SRM 53-00-53-2R-5. INSPECTED.;[07] INSTALLED NEW SECTION OF TRANSITION ANGLE FROM STA 727H+11.5 TO 807+7 PER SRM 53-00-53-2R-5.;[08] C/W INSPECTION.;[09] RII: C/W INSPECTION OF ALL CORRECTIVE ACTIONS AND STEPS FOR INSTALLATION OF NEW SECTION OF TRANSITION ANGLE FROM STA 727H+11.5 TO 807+7 PER SRM 53-00-53-2R-5 AND BONDED NUTPLATES.