What was found
CORROSION ON THRESHOLD TIE STRAP AT FASTENER HOLES BS 787+8 - 807+13 RBL 20 WL 159<[01] VERIFIED APPLICABILITY IAW SRM 53-60-15-01-1 AND SRM 53-60-15-1A-1;[09] OK TO INSTALL NEW THRESHOLD TIE STRAP.;[10] OKAY TO INSTALL GIVEN.;[11] STARTED INSTALLATION OF THRESHOLD TIE STRAP IAW SRM 51-40-02 AND DWG 146A8340 REV-; DWG 146A8120 REV A; DWG 146A0081 REV C;[12] EDIT TO CORRECTIVE ACTION 11<BR>APPLIED SEALANT AT 7:00 PM/11-JUL-2023 02:00 UTC<BR>BMS 5-95 TY 1 CL C 20;[13] INSTALLED THRESHOLD TIE STRAP AT ACB BETWEEN BS 767+6' TO BS 847+13' RBL20 WL 159IAW SRM 51-40-02 AND DWG:146A8120 AND DWG:146A0081.;[14] FINAL INSPECTION. JOB COMPLETE.