What was found
CRACKED LOWER R/H COMPOSITE BULKHEAD AT BS663 RBL33 WL153.<[01] PARTIAL STEP 1 TO 5;[02] REMOVED VAPOR BARRIER STA-663 IAW SRM 51-40-02-0G-0 RBL 6.15-70.;[03] RECIVED; LOCATED AND DRILLED NEW VAPOR BARRIER AT BS663 RBL33 WL153; IAW 737-700 SRM 51-40-05-0G-0 DWG 111A100 ; DWG 111A1001; DWG 144A7100 AND DWG 111A700;[04] OK TO INSTALL;[05] VERIFIED COMPLETION OF CORRECTIVE ACTIONS 3 AND MEASUREMENT TABLE.<BR>OK TO INSTALL NEW VAPOR BARRIER GIVEN;[06] OK TO INSTALL STEP 1 TO 5;[07] PARTIAL STEPS 1-5 <BR>OK TO INSTALL PARTS REMOVED BS 663 VAPOR BARRIER WEB GIVEN STEPS 1-5;[08] COMPLETED STEP 1-2;[09] INSTALLED NEW VAPOR BARRIER AT BS663 RBL33 WL153; IAW 737-700 SRM 51-40-02-0G-0 DWG 111A100 ; DWG 111A1001; DWG 144A7100 AND DWG 111A700.;[10] VERIFIED CORRECTIVE ACTION 9 COMPLETE.;[11] TASK CARD COMPLETE.