What was found
CORROSION ON FLOOR TO SIDEWALL SUPPORT AT ACB BS727E - BS767 RBL21 WL157.<[01] VERIFIED SRM 53-60-53-0I-2 FOR IDENTIFICATION AND SRM 53-00-53-1A-2 FOR ALLOWABLE DAMAGE.;[02] STEPS 1 AND 2 FOUND TO BE OUT OF LIMITS.;[03] VERIFIED CORRECTIVE ACTION 1 AND UPDATED STEP 1 & 2;[04] REMOVED FLOOR TO SIDEWALL SUPPORT AT ACB BS 727 TO BS 767 RBL 21 WL 157 IAW SRM 51-40-02.;[05] LOCATED AND DRILLED NEW FLOOR TO SIDEWALL SUPPORT P/N 146A7502-51 LOT: 1534305-2 IAW SRM 51-40-05 AND DWG 146A7500.<BR><BR>REQUIRE TO APPLY TOP COAT;3] CORRECTIVE ACTION 12<BR>REMOVED AND INSTALLED NEW FLOOR TO SIDEWALL SUPPORT<BR>P/N 146A7502-51 LOT: 1534305-2<BR>ON ACB BS 727 TO BS 767 RBL 21 WL 157 IAW SRM 51-40-02<BR>DWG 146A7500 AND DWG 146A7502<BR>ALL WORK COMPLETED.;[14] VERIFIED COMPLETION OF CORRECTIVE ACTIONS 12 AND MEASUREMENT TABLE.