What was found
CORROSION ON AFT CARGO BAY SHIELD BS 767+2 RBL 21 WL 156<[01] VERIFIED STEP 1.<BR><BR>VERIFIED MEASUREMENTS TABLE.;[02] REMOVED SHIELD BS 767-794 RBL 21 WL 156 PER SRM 51-40-02-0G-0.;[03] LOCATED; DRILLED AND DEBURRED NEW SHIELD BS 767-794 RBL 21 WL 156 PER SRM 51-40-05-0G-0; DWG 146A0081.;[04] VERIFIED CORRECTIVE ACTION #3.;[05] OK TO INSTALL SHIELD BS 767-794 RBL 21 WL 156.;[06] VERIFIED OK TO INSTALL SHIELD;[07] INSTALLED SHIELD BS 767-794; RBL21 WL 156 PER SRM 51-40-02-0G-0; DWG 146A0081.;[08] VERIFIED CORRECTIVE ACTION 7