What was found
CRACK INDICATION ON L/H H-STAB RIB #7 STIFFENER #4 UPPER RADIUS.<[01] REJECTED: L/H H-STAB RIB #7 STIFFENER #4 UPPER RADIUS CRACKED: THE SRM APPLICABILITY VALIDATION FOR REPAIR; AND NDT/VISUAL INSPECTIONS NOT PERFORMED AFTER DAMAGE REMOVAL. GENERATED TTG8Q00MUDHM;[02] CORRECTIVE ACTION 1; L/H H-STAB RIB #7 STIFFENER #4 UPPER RADIUS CRACKED: THE SRM APPLICABILITY VALIDATION FOR REPAIR; AND NDT/VISUAL INSPECTIONS NOT PERFORMED AFTER DAMAGE REMOVAL.<BR>IS CORRECTED ON STEPS:<BR>-SRM APPLICABILITY ON STEP 4.<BR>-NDT PERFORMED ON STEP 3.<BR>-GVI PERFORMED ON STEP 8.;[03] VERIFIED CORRECTIVE ACTION 2<BR>TTG8Q00MUDHM COMPLETE;[04] REMOVED THE DAMAGE PART AT DISCREPANCY AREA AND INSTALLED REPAIR PARTS IAW SRM 55-10-09-2R-4;[05] REMOVED THE DAMAGE PART AT DISCREPANCY AREA AND INSTALLED REPAIR PARTS IAW SRM 55-10-09-2R-4.<BR>MEASUREMENT TABLE UPDATED;[06] VERIFIED CORRECTIVE ACTION #5.;[07] VERIFIED MEASUREMENTS.