What was found
HORIZONTAL PRESSURE DECK IS CRACKED AT BS 665 LBL 33 WL202. APPROX 1 INCH IN LENGTH. FOUND ON HFEC INSPECTION. MARKED ENDS OF CRACK.<[01] SRM 53-40-51-2R-2 REPAIR 2 IS APPLICABLE;[02] CUT AND REMOVED THE DAMAGED PART OF THE WEB PER SRM 53-40-51-2R-2 FIGURE 203;[03] ACCOMPLISH ALL STEPS OF SRM REPAIR INSTRUCTIONS IN SUB-STEPS; SEE SUB-STEP 14.;[04] VERIFIED STEPS 19;20 IN PARTIAL.;[05] VERIFIED STEPS 7;13;18;21.;[06] REPAIRED CRACK IN HORIZONTAL PRESSURE DECK AT BS 665 LBL 33 WL202 IAW SRM SRM 53-40-51-2R-2-A01022.;[07] VERIFIED CORRECTIVE ACTION #6.<BR>VERIFIED MEASUREMENTS.