Service difficulty report · Floorbeam · Boeing 7378H4

Difficulty date
August 26, 2023
Submitted
September 25, 2023
Operation
Air carrier
Aircraft
N8672F
Make and model
Boeing 7378H4
Aircraft serial
36940
Aircraft time
26,408 hours, 12,731 cycles
Part
Floorbeam
Part number
UNKNOWN
Condition
Corroded
Location
Zn 100 Fus Lower
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT L/H LAV; AFT INBOARD LAV FLOOR MOUNT HAS AREA OF CORROSION AT ITS BASE.<[01] REMOVED CORROSION FROM FLOOR BEAM BENEATH AFT I/B LAV MOUNT AND FOUND DAMAGE TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[02] TRIMMED DAMAGED AREA OF FLOOR BEAM PER SRM 53-70-51-2R-5.;[03] INSPECTED CA # 2 AND VERIFIED DAMAGE REMOVAL WITH HFEC PER NDT PART 6 51-00-00 PROCEDURE 23; NO DEFECTS NOTED.;[04] FLAP PEENED CUT EDGES PER SRM 53-70-51-2R-5.;[05] ALODINE TREATED CUT EDGES PER SRM 51-20-01.;[06] FABRICATED REPAIR PARTS I.A.W SRM 53-70-51-2R-5.;[07] COMPLIED WITH INSPECTION OF THE FABRICATED REPAIR PARTS I.A.W SRM 53-70-51-2R-5. CA # 6;[08] VERIFIED CORRECTIVE ACTIONS #4 AND 5;[09] OK TO INSTALL REPAIR PARTS;[10] REPAIRED UPPER CHORD FLOOR BEAM AT STA 947 FROM LBL10-LBL42.5 IAW SRM 53-70-51-2R-5;[11] INSPECTED WORK PERFORMED ON C/A #10;[12] INSTALLED AFT LAV MOUNT AT STA 947 LBL 26 PER SRM 51-40-02;[13] INSTALLED AFT LAV MOUNT AT STA 947 LBL 26 PER SRM 51-40-02;[14] INSTALLED AFT LAV MOUNT AT STA 947 LBL 26 PER SRM 51-40-02