What was found
AFT CARGO COMPARTMENT FLOOR STRUCTURE AND BILGE AREA RH Z-CHANNEL WITH CORROSION AREAS BETWEEN STA 787 THRU STA 767. AFT CARGO COMPARTMENT FLOOR STRUCTURE AND BILGE AREA RH FWD SHIELD WITH CORROSION AREAS BETWEEN STA 787 THRU STA 767.<[01] REMOVED CORROSION; PERFORMED UT THICKNESS INSPECTION; CHECKED LIMITS OF AREA FOUND OUT OF LIMITS ON AFT CARGO FWD SHIELD; RECEIVED NEW AFT CARGO FWD SHIELD; LOCATED AND DRILLED HOLES; TREATED AND PRIMED AND INSTALLED NEW AFT CARGO FWD SHIELD FROM STA 787 TO STA 767; PER SRM 51-10-02-0G-0; PER SRM 53-60-15-1A-1; PER SRM 51-40-05-0G-0; PER AMM 51-21-41-370-803; AMM 51-21-72-370-804; AND PER SRM 51-40-02-0G-0.;[02] VERIFIED STEP 1.