What was found
#2 GENERATOR 'DRIVE' ILLUMINATED ; COMPLIED W/QRH<[01] OK TO CONTINUE PER MEL 24-1-02 . SP#1;[02] R & R #2 ENGINE IDG REF AMM 24-11-11 OPS CHECK AND LEAK CHECK OF IDG GOOD.;[03] C/W
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
#2 GENERATOR 'DRIVE' ILLUMINATED ; COMPLIED W/QRH<[01] OK TO CONTINUE PER MEL 24-1-02 . SP#1;[02] R & R #2 ENGINE IDG REF AMM 24-11-11 OPS CHECK AND LEAK CHECK OF IDG GOOD.;[03] C/W