What was found
CUSTOMER REQUEST - DEBONDED IB MAIN FLAP WEDGE PANEL LOWER SURFACE AT RT WING 2023-584427<[01] TOOL USED: CALIPER P/N: 500-197-30; S/N:B20189527; DUE DATE 26 DEC 23;[02] TOOL USED HOT BONDER: PN: HCS9000B; SN: 15092096; DUE DATE: 25/APR/24.;[03] TOOL USED: HOT BONDER P/N: HCS9200B-AV; S/N: 18185733; DUE DATE: 23-JAN-24; POSITECTOR P/N: NS2; S/N: 138341; DUE DATE: 25-JUL-24.;[04] TOOL USED: CALIPER P/N: 500-197-30; B20189416; DUE DATE: 19-DEC-23.;[05] TOOL USED HOT BONDER PN: HCS9200B-AV; SN: 18185733; DUE DATE: 23/JAN/24.;[06] TOOL USED UT EQUIPMENT P/N: EPOCH 600; S/N: 130547106; CAL DUE DATE: 25-AUG-24;[07] TOOL USED SCALE PN: SPX621; SN: 8340225469; DUE DATE: 20/JUL/24.;[08] REPAIRED I/B MAIN FLAP WEDGE PANEL LOWER SURFACE AT RT WING IAW B737-700 SRM 57-53-01-2R-7 REPAIR 7. SEE INDIVIDUAL SIGNOFFS BELOW.;[09] STEP 8 VERIFIED AND CORRECTIVE ACTION COMPLETED: ITEM RII REPAIRED I/B MAIN FLAP WEDGE PANEL LOWER SURFACE AT RT WING IAW B737-700 SRM 57-53-01-2R-7 REPAIR 7. SEE INDIVIDUAL SIGNOFFS BELOW.