What was found
AFT CARGO L/H TRANSITION ANGLE FROM STA 727E TO STA 727I +6 HAS CORROSION AT SEVERAL FASTENER HOLES.(MARKED). / [01] BLENDED AREAS OF CORROSION ON AFT CARGO L/H TRANSITION ANGLE FROM STA 727E TO STA 727I +6; BLENDS ARE OUT OF LIMITS ALL IAW SRM 53-00-53-1A-2.;[02] LOCATED FASTENER AND NUT PLATE HOLES;COUNTERSINK AND DEBURED NEW REPLACEMENT TRANS ANGLE STA 727C+10 TO 727I+10 PER SRM 51-40-05.SRM 51-40-08.;[03] LOCATED FASTENER AND NUT PLATE HOLES;COUNTERSINK AND DEBURED NEW REPLACEMENT TRANS ANGLE STA 727C+10 TO 727I+10 PER SRM 51-40-05.SRM 51-40-08. INSPECTION C/W.;[04] PARTS DATA UPDATE ONLY;[05] TREATED AND PRIMED REPLACEMENT TRANSITION ANGLE PER SRM 51-20-01.;[06] INSPECTED THE WORK PERFORMED ON C/A #5; NO DEFECTS NOTED.;[07] INSPECTED / VERIFIED STEP #1; NO DEFECTS NOTED.;[08] INFORMATION: DOCUMENTED BONDED NUTPLATE INSTALLATION ON SEPARATE FAULT TTG8Q00P86CA. REASON: WE ARE USING THE ALTERNATE ADHESIVE PER EA M-23-151-01545 AND THE EA MANDATES 'ENSURE THE EA-GENERAL REPAIR REFERENCE IS SELECTED'.;[09] APPLIED CIC TO REPLACEMENT SECTION OF TRANSITION ANGLE; STA 727C+10 TO STA 727I+10 PER AMM 51-21-91.;[10] APPLIED CIC TO REPLACEMENT SECTION OF TRANSITION ANGLE; STA 727C+10 TO STA 727I+10 PER AMM 51-21-91. INSPECTION C/W.;[11] OK TO INSTALL.;[12] INSTALLED REPLACEMENT SECTION OF TRANSITION ANGLE; STA 727C+10 TO STA 727I+10 PER SRM 51-40-02.;[13] VERIFIED WORK COMPLETED ON CORRECTIVE ACTION #12