What was found
CORROSION ON FLOOR BEAM AT FASTENER HOLE 986.5 LBL 43<[01] BLENDED CORROSION ON UPPER FLANGE OF FLOOR BEAM 986.5 AT LBL 43? PER SRM 51-10-02. REMOVED .016? OF MATERIAL. REMAINING THICKNESS IS .134?. DAMAGE REMOVAL IS OUT OF LIMITS PER SRM 53-70-51-1A-1.;[02] VERIFIED CORRECTIVE ACTION #1.;[03] REMOVED DAMAGED PORTION OF FLOOR BEAM PER SRM 53-70-51-2R-6; ALTERNATIVE 4.;[04] ACCOMPLISHED HFEC SURFACE AND HOLE PROBE INSPECTION PER NDT PART 6 51-00-00 PROC. 23 AND 51-00-00 PROC. 16;[05] FLAP PEENED CUT EDGE PER SRM 53-70-51-2R-6.;[06] C/W INSPECTION OF CORRECTIVE ACTION #5;[07] PERFORMED DETAILED VISUAL INSPECTION OF REPAIR AREA AND ADJACENT STRUCTURE PER SRM 53-70-51-2R-6. NO DEFECTS NOTED.;[08] FABRICATED AND DRILLED REPAIR PARTS PER SRM 53-70-51-2R-6; ALTERNATIVE 4.;[09] VERIFIED CORRECTIVE ACTION #8. OK TO TREAT AND PRIME.;[10] ALODINED AND PRIMED REPAIR PARTS AND REWORK AREA PER SRM 51-20-01 AND SOPM 20-41-02.;[11] VERIFIED CORRECTIVE ACTION #10.;[12] OK TO INSTALL REPAIR.;[13] INSTALLED REPAIR PARTS WET; SEALED; AND PAINTED REPAIR PER SRM 53-70-51-2R-6; ALTERNATIVE 6.;[14] VERIFIED CORRECTIVE ACTION #13. RII INSPECTION C/W.