What was found
CORROSION AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS MULTIPLE AREAS AROUND NUT PLATE HOLES BS727E+19' TO BS767 RBL22 WL156<[01] VERIFIED STEPS 1;2 COMPLETE AND MEASUREMENT TABLE.;[02] VERIFIED STEPS 1-6;[03] MADE CORRECTIONS AND CHANGED STEP STATUS TO PARTIAL ON STEPS 4 AND 6;[04] CERTIFIED;[05] CORROSION DAMAGE ON ACB R/H FLOOR TO SIDEWALL SUPPORT BS727E+19 TO BS767; RBL22; WL156 WAS FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2. CUT AND REMOVED DAMAGED SECTION OF FLOOR TO SIDEWALL SUPPORT BS727+12 TO BS767; RBL22; WL156 PER SRM 53-00-53-2R-5. LOCATED; DRILLED AND INSTALLED REPLACEMENT FLOOR TO ACB R/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS COMPLETE PER SRM 53-00-53-2R-5.;[06] VERIFIED COMPLETION OF CORRECTIVE ACTIONS 5 AND MEASUREMENT TABLE.