What was found
AFT CARGO R/H TRANSITION ANGLE HAS CORROSION ON UPPER SURFACE STA 727I TO 727I+22 RBL 22. MRKD<[01] AFT CARGO COMPARTMENT DAMAGE ON RT SIDEPLATE CHANNEL UPPER SURFACE FORM STA 727G + 10 TO STA 767; RBL 22; WAS FOUND TO BE OUT OF ALLOWABLE LIMITS IAW SRM 53-00-53-1A-2. REMOVED RT SIDEPLATE CHANNEL FROM STA 727G + 10 TO STA 767; RBL 22; IAW SRM 53-00-53-2R-5 REFERENCE NRC TTG8Q00PFA62 FOR WORK PERFORMED.;[02] CORRECTIVE ACTION #1 ENTERED IN ERROR.;[03] AFT CARGO COMPARTMENT RT SIDEPLATE CHANNEL DAMAGE BETWEEN STA 727I TO STA 727I + 22; RBL 21; WL 155 WAS FOUND TO BE OUT OF ALLOWABLE LIMITS IAW SRM 53-00-53-1A-2. SIDEPLATE CHANNEL ASSEMBLY TO BE REPLACED; REFERENCE NRC TTG8Q00PFA62 FOR WORK PREFORMED.;[04] VERIFIED WORK IN C/A #3 (RII)