What was found
AFT CARGO R/H TRANSITION ANGLE HAS CORROSION ON UPPER SURFACE STA 727H TO 727H+22 RBL 22. MRKD<[01] AFT CARGO COMPARTMENT DAMAGE ON RT SIDEPLATE CHANNEL UPPER SURFACE FORM STA 727H TO STA 727H + 22; RBL 22; WAS FOUND TO BE OUT OF ALLOWABLE LIMITS IAW SRM 53-00-53-1A-2.;[02] REMOVED RT SIDEPLATE CHANNEL FORM STA 727G + 10 TO STA 767; RBL 22; IAW SRM 53-00-53-2R-5.;[03] LOCATED; DRILLED RT SIDEPLATE CHANNEL AND REPAIR PARTS IAW SRM 53-00-53-2R-5.;[04] INSPECTION COMPLETE ON CORRECTIVE ACTION #3 FOR LOCATING AND DRILLING OF THE RIGHT HAND SIDEPLATE FROM STA 727G + 10 TO STA 767; RBL 22; IAW SRM 53-00-53-2R-5.;[05] TREATED; PRIMED AND ASSEMBLED RIGHT SIDEPLATE CHANNEL REPAIR PARTS FROM STA 727G + 10 TO STA 767; RBL 22; IAW SRM 53-00-53-2R-5. OK TO INSTALL SERVICEABLE REPAIR PARTS.;[06] OHN PRAMUK (TECHNICIAN); 15-NOV-2023 14:43 UTC<BR>TREATED; PRIMED AND ASSEMBLED RIGHT SIDEPLATE CHANNEL REPAIR PARTS FROM STA 727G + 10 TO STA 767; RBL 22; IAW SRM 53-00-53-2R-5. OK TO INSTALL SERVICEABLE REPAIR PARTS.;[07] INSTALLED CLICKBOND NUT PLATES @ 15:30; 15 NOV.2023 PER SRM 51-40-10-2R-0;[08] INSTALLED FABRICATED R\H SIDEPLATE AND REPAIR PARTS PER SRM 53-00-53-2R-5.;[09] INSPECTED LINE 7 AND LINE 8.;[10] NUTPLATE BOND TEST C/W;[11] NUTPLATE BOND TEST C/W IAW SRM 51-40-10-2R-0.