What was found
CORROSION ACB CARGO RAIL STA-767 LBL-8.1 DAMAGE LOCATION CLARIFICATION=CORROSION ON ACB CARGO RAIL STA 767 +4' LBL-8.1<[01] UPDATED FABRICATION MATERIAL;[02] REMOVED CORROSION AT ACB RAIL STA 767 LBL 8.1<BR>FOUND OUT OF LIMITS IAW SRM 53-60-53-0L-2<BR>PERFORMED TRIM OUT OF THE UPPER FLANGE OF RAIL BEAM<BR>IAW SRM 53-00-53-2R-2. REPAIR 2. ALTERNATIVE 5.<BR>RECEIVED AND INSTALLED REINFORCING CHANNEL <BR>ALL STEPS COMPLETED;[03] VERIFIED COMPLETION OF CORRECTIVE ACTIONS 2 AND MEASUREMENT TABLE.