What was found
FWD CARGO RIGHT TRANS-ANGLE CORRODED STA 500A TO 500E+10<[01] WORKED CORROSION ON RT ANGLE PER SRM 51-10-02; REMOVED .020 MATERIAL. REWORKED AREA OUT OF LIMITS PER SRM 53-00-53-1A-2;[02] REMOVED R/H TRANSITION ANGLE ASSY PN 143A7501-188 PER AMM 51-40-02.;[03] REMOVED BAFFLE AT 500E- 500F PER SRM 51-40-02.;[04] R&R BAFFLE AT LOCATION 500E-500F. DRILLED PER SRM 51-40-05; AND INSTALLED PER SRM 51-40-02;[05] PARTS INFO ONLY;[06] CW INSPECTION OF STEP #4.;[07] DRILLED NEW TRANS ANGLE PER SRM 51-40-05; AND COUNTERSINK PER SRM 51-40-08;[08] STEP # 7 OK TO INSTALL RH TRANSITION ANGLE.;[09] INSTALLED NEW TRANS ANGLE PER SRM 51-40-02;[10] C/W INSPECTION