As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
CRACKED FLOOR SUPPORT AT BS 390 LBL 3 WL 208<[01] REMOVED FLOOR SUPPORT FROM BS 390 TO BS 400 WL 208 LBL 3 PER SRM 51-40-02-0G-01;[02] ALL STEPS COMPLETED REMOVED CRACKED FLOOR SUPPORT FROM BS 390 TO BS 400 WL 208 LBL 3 PER SRM 51-40-02-0G-01 LOCATED AND DRILLED NEW FLOOR SUPPORT AT BS 390 LBL 3 WL 208 PER SRM 51-40-05 BOEING DWG 143A5400 INSTALLED NEW FLOOR SUPPORT AT BS 390 LBL 3 WL 208 PER SRM 51-40-02 BOEING DWG 143A5400