What was found
AFT CARGO R/H TRANSITION ANGLE HAS CORROSION RBL 22 STA 727I-727J<[01] FOUND CORROSION ON R/H SIDE PLATE OUT OF ALLOWABLE LIMITS PER SRM 53-00-53-!A-2.;[02] CUT SECTION OF TRANSITION ANGLE AT STA 727H + 10 AND REMOVED SECTION FROM 727H+10 TO STA 767. PER SRM 53-00-53-2R-5.;[03] FABRICATED AND DRILLED NEW SECTION OF TRANSITION ANGLE FROM 727H+10 TO 767 PER SAMPLE AND FABRICATED REPAIR SPLICE PER SRM 53-00-53-2R-05. OK TO TREAT AND PRIME.;[04] RII: INSPECTED WORK ACCOMPLISHED IN C/A 'S<BR><BR>2. RICHARD PARRY (TECHNICIAN); 16-DEC-2023 04:48 UTC CUT SECTION OF TRANSITION ANGLE AT STA 727H + 10 AND REMOVED SECTION FROM 727H+10 TO STA 767. PER SRM 53-00-53-2R-5.<BR><BR>3. RICHARD PARRY (TECHNICIAN); 17-DEC-2023 01:31 UTC FABRICATED AND DRILLED NEW SECTION OF TRANSITION ANGLE FROM 727H+10 TO 767 PER SAMPLE AND FABRICATED REPAIR SPLICE PER SRM 53-00-53-2R-05. <BR><BR>OK TO TREAT AND PRIME.;[05] TREATED AND PRIMED ZEE ANGLE AND REPAIR PARTS PER SRM 51-20-01 AND SOPM 20-41-02;[06] INSPECTED TREAT AND PRIME;[07] OK TO INSTALL R/H. SIDE PLATE;[08] OK TO INSTALL TRANSITION ANGLE.;[09] INSTALLED R/H SIDE PLATE FROM STA.727H+11 TO 767 PER SRM 53-00-53-2R-5.;[10] C/W INSPECTION.;[11] R/R R/H TRANSITION ANGLE FROM STA 727H+10? TO STA 767 PER SRM 53-00-53-2R-5;[12] TOOL ADDED;[13] RII; COMPLIED WITH INSPECTION; R/R R/H TRANSITION ANGLE FROM STA 727H+10? TO STA 767 PER SRM 53-00-53-2R-5