What was found
CORROSION ON BS 947.5 FLOOR BEAM LBL 52 WL 208<[01] EDITED CORRODED P/N;[02] UPDATED STEP 14;[03] PARTIAL STEP 14;[04] PARTIAL STEP 14;[05] PARTIAL STEP 16-17-18;[06] PARTIAL UPDATE STEP 15;[07] PARTIAL UPDATE STEP 19;[08] PARTIAL UPDATE STEP 20;[09] COMPLETED STEPS 14 & 22.;[10] PERFORMED REPAIR ON THE UPPER CHORD OF THE FLOOR BEAM AT B/S 947.5 FROM RBL 29 TO LBL 58.60 IAWSRM 53-70-51-2R-5 REPAIR 5;[11] UPDATE MEASUREMENTS PARAMETERS;[12] UPDATED MEASUREMENTS TABLE