What was found
ON CLIMBOUT RT CTR PUMP LOW PRESSURE LIGHT ILLUMINATED RESULTING IN RT MAIN IMBALANCE OF 800-1000 LBS. OPENED CROSSFEED AND BALANCED MAIN TANKS BY TURNING OFF LEFT CTR PUMP AND RT MAIN PUMPS. NO OWL NO OVERWEIGHT LANDING NOTED.<[01] PERFORMED FIM TASK 28-41 TASK 814. FQIS BITE PASSED PER TASK 28-41 TASK 801. PERFORMED RT MAIN TANK COMPARISON CHECK PER AMM 28-41-00 AND VERIFIED ACCURATE QUANTITY WITH FUEL MEASURING STICKS. RT CTR TANK FUEL PUMP OK TO CONTINUE ON MEL 28-2-05 SP1 AND SP 2. AUTH # 177675;[02] TRANSFERRED APROX. 3500LBS OF FUEL IN CNTR TANK. R/H CNTR BOOST PUMP TRANSFERRED FUEL BACK INTO BOTH WINGS WITH NO FAULTS NOTED. NO ABNORMAL QUANTITY IND WHILE MOVING FUEL. OPS CHK GOOD PER AMM 28-22-41 & AMM 28-26-00.