What was found
MAIN CABIN CENTER SECTION FLOOR SUPPORT BREAK CRACKED @ RBL 1 STA 540 MKD DOT<[01] REMOVED FLOOR SUPPORT AS PER SRM 51-40-02-0G-0 LOCATED AND DRILLED NEW FLOOR SUPPORT AS PER SRM 51-40-05-0G-0 AND INSTALLED NEW FLOOR SUPPORT ON MAIN CABIN STA 540 RBL=1 TO RBL-24 AS PER SRM 51-40-02-0G-0;[02] VERIFIED;[03] VERIFIED REMOVED FLOOR SUPPORT AS PER SRM 51-40-02-0G-0 LOCATED AND DRILLED NEW FLOOR SUPPORT AS PER SRM 51-40-05-0G-0 AND INSTALLED NEW FLOOR SUPPORT ON MAIN CABIN STA 540 RBL=1 TO RBL-24 AS PER SRM 51-40-02-0G-0