What was found
CRACK BODY STATION 663.75 VAPOR BARRIER LOCATED LBL 36; WL 159 AT MAIN WHEEL WELL COMPARTMENT 2024-121228<[01] TOOL USED: CALIPER P/N: 500-464 S/N: B17030933 DUE DATE: 07-NOV-24.;[02] TOOL USED: HOT BONDER P/N: HCS9200B-AV S/N: 18196127 DUE DATE: 25/JAN/25.;[03] TOOL USED SCALE P/N: CR5200 S/N: 8343110809 DUE DATE: 21 FEB 24.;[04] TOOL USED HOT BONDER P/N: HCS9200B; S/N: 15102320; DUE DATE: 25-JAN-25.;[05] TOOL USED SCALE P/N: CL5000 S/N: AE-408753 DUE DATE: 27-JUL-24.;[06] ULTRASONIC EQUIPMENT USED P/N: EPOCH 650; S/N: 190859705 AND DUE DATE: 23-OCT-24.;[07] REPAIRED VAPOR BARRIER LOCATED LBL 36; WL 159 AT MAIN WHEEL WELL COMPARTMENT IAW B737-700 SRM 51-70-04-2R-10 REPAIR 10 SEE INDIVIDUAL SIGN OFFS BELOW;[08] JOB TASK COMPLETED. RII INSPECTION COMPLETED.