Service difficulty report · Floorbeam · Boeing 7378H4

Difficulty date
June 1, 2024
Submitted
July 1, 2024
Operation
Air carrier
Aircraft
N8696E
Make and model
Boeing 7378H4
Aircraft serial
36678
Aircraft time
26,266 hours, 12,981 cycles
Part
Floorbeam
Part number
UNKNOWN
Condition
Corroded
Location
Bs 947
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CABIN FLOORBEAM HAS UPPER SURFACE CORROSION STA 947 LBL 23-27 WL 208. MRKD<[01] MEASURED PRE BLENDING DAMAGE AND FOUND OVER 50% MATERIAL LOSS. ORIGINAL PART THICKNESS = .180?; MATERIAL LOSS IS >.090?. DAMAGE IS OUT OF LIMITS PER SRM 53-70-51-1A1.[17] OK TO INSTALL NEW INTERCOSTAL BETWEEN STA 947-967; LBL 24 PER SRM 51-40-05. REF CORRECTIVE ACTION # 16.;[18] INSTALLED NEW INTERCOSTAL BETWEEN STA 947-967; LBL 24 PER SRM 51-40-02;[19] RII. VERIFIED INSTALLATION OF NEW INTERCOSTAL BETWEEN STA 947-967; LBL 24 PER SRM 51-40-02. LAV ATTACH FITTING AT STA 947 LBL 24 TO BE INSTALLED ON STEP1 OF THIS CARD. SIGN OFF FOR CORRECTIVE ACTION #18.;[20] REPAIRED DAMAGED FLOOR BEAM PER SRM 53-70-51-2R-5; ALTERNATIVE 2 AND EA 24-153-01528; WIP1 AND WIP2.;[21] 02 - INSPECTED PER [REFERENCE] EA 24-153-01528 WIP 1AND2 AND SRM 51-40-02;[22] 02 - INSPECTED PER [REFERENCE]EA 24-153-01528 WIP 1AND2 AND SRM 51-40-02;[23] 02 - INSPECTED PER [REFERENCE]EA 24-153-01528 WIP 1AND2 AND SRM 51-40-02