What was found
CUSTOMER REQUEST - DEBONDED OB AFT FLAP IB SIDE AT LT WING 2024-414775<[01] STEP 5. TOOL USED ULTRASONIC EQUIPMENT PN: EPOCH 650 ; SN: 190859705; DUE DATE: 23-OCT-24.;[02] TOOL USED; HOTBONDER PN: HCS9200B-AV; SN: 18185733; DUE DATE: 25/JAN/25.;[03] TOOL USED; HOT BONDER P/N: HCS9200B; S/N: 18165044; DUE DATE: 11/APR/25; CALIPER P/N: 500-464; S/N: B17030933; DUE DATE: 07/NOV/24.;[04] TOOL USED: BOND TESTING UNIT; P/N: BONDMASTER 600 M; S/N: 220052310; DUE DATE: 17-NOV-24.;[05] PERFORMED INTERIM REPAIR ON O/B AFT FLAP AT LT WING IAW B737-800 SRM 57-53-01-2R-16 REPAIR 16 AND THE REPAIR REQUIRED TAP TEST INSPECTION EVERY 6;875 CYC. O 30 MONTHS. SEE INDIVIDUAL SIGNOFF BELOW.;[06] PERFORMED INTERIM REPAIR ON O/B AFT FLAP AT LT WING IAW B737-800 SRM 57-53-01-2R-16 REPAIR 16 AND THE REPAIR REQUIRED TAP TEST INSPECTION EVERY 6;875 CYC. O 30 MONTHS. SEE INDIVIDUAL SIGNOFF BELOW. RII ACOMPLISHED