What was found
CORROSION FLOOR BEAM LOCATED BS 947.5 AND LBL 24 WL 208.1 AT AFT GALLEY AREA 2024-414863<[01] TOOL USED ON STEP 6 ET EQUIPMENT: P/N: NORTEC 600D; S/N: 220272512; CAL DUE DATE: 08-JAN-25;[02] PERFORMED REPAIR ON FLOOR BEAM LOCATED BS 947.5 AND LBL 24 WL 208.1 AT AFT GALLEY AREA I.A.W EA 24-153-01961-WIP1 AND EA SUMMARY 24-153-01961;SEE INDIVIDUIAL STEP SIGN OFFS BELOW;[03] PERFORMED REPAIR ON FLOOR BEAM LOCATED BS 947.5 AND LBL 24 WL 208.1 AT AFT GALLEY AREA I.A.W EA 24-153-01961-WIP1 AND EA SUMMARY 24-153-01961;SEE INDIVIDUIAL STEP SIGN OFFS BELOWAS RII