What was found
ACCOMPLISH REPAIR OF L/H VAPOR BARRIER AS REQUIRED<[01] LATE ENTRY ; WORK ACCOMPLISHED ON 08-04-24; APPLIED REPAIR AT L/H VAPOR BARRIER STA 663 ON FWD AND AFT SIDE AS PER B737 SRM 51-70 -04-2R-10 PARAG 4F AND 737 SRM57-10-10-2R-2 AND SRM 51-70-04-2R-0 PARAG4-N-2. MATERIAL USED EY 3804 A/B PO 2070272 PLUS HCS2410-10 PO 2061577.;[02] APPLIED REPAIR AT L/H VAPOR BARRIER STA 663 ON FWD AND AFT SIDE AS PER B737 SRM 51-70 -04-2R-10 PARAG 4F AND 737 SRM57-10-10-2R-2 AND SRM 51-70-04-2R-0 PARAG4-N-2. MATERIAL USED EY 3804 A/B PO 2070272 PLUS HCS2410-10 PO 2061577.;[03] FINAL INSPECTION; VERIFIED STEP #2.