What was found
ACCOMPLISH REPAIR OF R/H VAPOR BARRIER AS REQUIRED<[01] LATE ENTRY ;WORK ACCOMPLISHED ON 08-04-2024; APPLIED REPAIR AT R/H VAPOR BARRIER STA 663 ON FWD AND AFT SIDE AS PER B737 SRM 51-70-04-2R-10 PARG 4F AND B737 SRM 57-10-10-2R-2 AND SRM 51-70-04-2R-0 PARAG 4-N-2 MATERIAL USED EY 3804 PO#2070272 PLUS HCS2410-010 PO#2061577.;[02] APPLIED REPAIR AT R/H VAPOR BARRIER STA 663 ON FWD AND AFT SIDE AS PER B737 SRM 51-70-04-2R-10 PARG 4F AND B737 SRM 57-10-10-2R-2 AND SRM 51-70-04-2R-0 PARAG 4-N-2 MATERIAL USED EY 3804 PO#2070272 PLUS HCS2410-010 PO#2061577.;[03] (RII) FINAL INSPECTION; VERIFIED STEP #2.