What was found
L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD CRACKED AT LBL 37<[01] MATCH DRILLED AND DEBURRED NEW UPPER CHORD PER SRM 51-40-02/SRM51-10-02.;[02] OK TO INSTALL L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD.;[03] INSPECTION VERIFIED 'OK TO INSTALL L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD'.;[04] INSTALLED AND DOMED SEALED FASTENERS COMMON TO FUEL TANK ON UPPER CHORD PER SRM 51-40-02 AND AMM 28-11-00;[05] VERIFIED INSTALLED AND DOMED SEALED FASTENERS COMMON TO FUEL TANK ON UPPER CHORD PER SRM 51-40-02 AND AMM 28-11-00.;[06] INSTALLED NEW L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD PER SRM 51-40-02.;[07] INSTALLED NEW L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD PER SRM 51-40-02. (RII) <BR><BR>OK TO DOME SEAL ALL FASTENERS AS REQUIRED;[08] PARTS DATA UPDATE ONLY;[09] INSTALLED NEW L/H AC BAY STA 663 VAPOR BARRIER UPPER CHORD PER SRM 51-40-02/SRM 51-10-02.;[10] 01 - REMOVED AND REPLACED VAPOR BARRIER UPPER CHORD PER [SRM 51-40-02-0G-0-B00069 (GENERAL - FASTENER INSTALLATION AND REMOVAL - AIRFRAME - PERMANENT)];[11] VERIFED TASK COMPLETE