Service difficulty report · Floorbeam · Boeing 7377H4

Difficulty date
July 31, 2024
Submitted
August 30, 2024
Operation
Air carrier
Aircraft
N485WN
Make and model
Boeing 7377H4
Aircraft serial
32473
Aircraft time
66,453 hours, 39,795 cycles
Part
Floorbeam
Condition
Corroded
Location
Zone 200
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AT FLOOR BEAM UPPER CAP STA 986.5; RBL 44; WL 208<[01] SUMMARY :REMOVED CORROSION AT STA 986.5 RBL 44 AS PER B 737 SRM 51-10-02-0G-0.PERFORMED UT THICKNESS INSP ON REWORKED AREA;<BR>IAW B737 NDT PART 4 51-00-00 PROC. 3<BR>TOOLS: OLYMPUS 27MG; B/C 172139; CAL. DUE: 04-04-2025.INSTALLED FILLER IAW SRM 53-70-51-2R-6 REPAIR 6; FIG 205.<BR>MINIMUM THICKNESS NOTED: 0.087?.EVALUATED REWORKED AREA AT FLOOR BEAM STA 986.5 RBL 44 WL 208 ORIGINAL MAT. 0.150 MAT. LOSS 0.063 MAT. REMAINING 0.087 AREA FOUND TO BE OUT LIMITS AS PER B-737-SRM 53-70-51-1A-1 DETAIL C. COMPLETE FLOOR BEAM CUT OUT AS PER B-737- SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4 STA 986.5 RBL 44 .PERFORMED DVI OF DAMAGED AREA NO DEFECTS FOUND PER REF SRM 53-70-51-2R-6.<BR>PERFORMED HFEC INSP. ON CUTOUT AREA IAW B737 NDT P. 6; 51-00-00 PROC. 23. NO CRACKS. EQUIP: NORTEC 600 B/C 172389 CAL DUE: 04/25.PERFORMED FLAP PEEN ON CUT OUT EDGE PER SOPM 20-10-03 USED TOOL B/C 19435 DUE DATE 25-SEP-24.FINISHED DRILLING AND TRIMMING OF REPAIR STRAP AND REPAIR ANGLE REF. B/737SRM 53-70-2R-6 REPAIR 6.<BR>PENDING REPAIR FILLER FABRICATION. FABRICATED FILLER 7075-T6 0.150 AS PER B-737- SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4.<BR>INSTALLED REPAIR PARTS (100% OF FASTENERS) [1] STRAP AND [2] ANGLE IAW SRM 53-70-51-2R-6 REPAIR 6; FIG 205.INSTALLED FILLER IAW SRM 53-70-51-2R-6 REPAIR 6; FIG 205.;[02] RII VERIFIED CORRECTIVE ACTION.