What was found
FWD CARGO COMPT L/H Z CHANNEL FASTENER HOLE ELONGATED AT STA 480+6.<[01] REMOVED FWD CARGO COMPARTMENT L/H Z CHANNEL FROM STA 400 TO STA 480+8 PER SRM 51-40-02-0G-0; REMOVED Z CHANNEL SPLICE AT FWD CARGO COMPARTMENT L/H BETWEEN STA 480 AND 500 PER SRM 51-40-02-0G-0; FABRICATED NEW SPLICE PER SRM 53-00-53-2R-5 MATERIAL USED BAC 1496-444 PO:2072494; FABRICATED; LOCATED AND DRILLED Z CHANNEL SECTION L/H FROM STA 396 TO STA 490 PER SRM 51-40-05-0G-0; TREATED AND PRIMED PER SRM 51-20-01-0G-0; INSTALLED SPLICE AND Z CHANNEL PER SRM 53-00-53-2R-5 AND SRM 51-40-02-0G-0; DWG 143A7500.;[02] VERIFIED STEP 1