What was found
L/H WING I/B MAIN FLAP HAS LARGE AREA OF DELAMINATION ON FIXED TRAILING EDGE WEDGE.<[01] REMOVED TRAILING EDGE WEDGE F.O.M.;[02] DRILLED NEW WEDGE ASSY 113A2550-603 PER SRM 51-10-02.;[03] INSPECTED AS REQUIRED. CORRECTIVE ACTION #1 AND #2;[04] PAINTED EXTERIOR FINISH PER AMM 51-21-99.;[05] REINSTALLED I/B FIXED TRAILING EDGE WEDGE PER SRM 51-40-02.;[06] REINSTALLED I/B FIXED TRAILING EDGE WEDGE PER SRM 51-40-02.;[07] C/W INSPECTION