What was found
L/H WING I/B MAIN FLAP T/E WEDGE DELAMINATION OUT OF LIMITS<[01] REMOVED L/H WING I/B MAIN FLAP T/E WEDGE .;[02] LOCATED AND DRILLED L/H WING I/B MAIN FLAP T/E WEDGE PER SRM 51-40-02.;[03] LOCATED AND DRILLED L/H WING I/B MAIN FLAP T/E WEDGE PER SRM 51-40-02.INSPECTED;[04] REFINISHED PAINT PER AMM 51-21-99.;[05] REMOVED AND REPLACED L/H WEDGE PER SOPM 20-50-01;[06] REMOVED AND REPLACED L/H WEDGE PER SOPM 20-50-01<BR>SEAL WILL BE INSTALLED ON TASK TTG8Q00UPSZ2;[07] INSPECTED CA# 4;5;6; SEAL WILL BE INSTALLED ON TASK TTG8Q00UPSZ2