What was found
DEBONDED OB AFT FLAP LOWER SURFACE IB SIDE AT RT WING 2024-512149<[01] TOOL USED: CALIPER P/N: 500-197-30 S/N: A18229508 DUE DATE: 14-JAN-25.;[02] ON STEP 3: TOOL USED BOND TESTING UNIT PN: BONDMASTER 600M; SN: 220052310; DUE DATE: 17 NOV 24;[03] TOOL USED; HOT BONDER PN: HCS9200B-AV; SN: 18196127; DUE DATE: 25/JAN/25.;[04] TOOL USED; POSITECTOR PN: POSITECTOR 6000 NS3; SN:767584; DUE DATE: 30/AUG/25.;[05] TOOL USED: CALIPER P/N: 500-197-30 S/N: B20189443 DUE DATE: 06-MAR-25.;[06] TOOL USED: COATING THICKNESS GAUGE P/N:POSITECTOR 6000 NS3; S/N:767584; DUE DATE: 30-AUG-25.;[07] TOOL USED: BOND TESTING EQUIPMENT; PN: BONDMASTER 600M; SN: 230106912; DUE DATE: 09-JAN-25.;[08] TOOL USED BOND TESTING UNIT PN: BONDMASTER 600M; SN: 220052310; DUE DATE: 17-NOV-24;[09] PERFORMED INTERIM REPAIR ON OB AFT FLAP LOWER SURFACE IB SIDE AT RT WING IAW B737-800 SRM 57-53-01-2R-16 REPAIR 16 AND THE REPAIR REQUIRED TAP TEST INSPECTION EVERY 6;875 CYC OR 30 MONTHS. SEE INDIVIDUAL SIGNOFFS BELOW.;[10] PERFORMED INTERIM REPAIR ON OB AFT FLAP LOWER SURFACE IB SIDE AT RT WING IAW B737-800 SRM 57-53-01-2R-16 REPAIR 16 AND THE REPAIR REQUIRED TAP TEST INSPECTION EVERY 6;875 CYC OR 30 MONTHS. SEE INDIVIDUAL SIGNOFFS BELOW.