What was found
AFT CARGO BAY FLOOR PNL 140DF CAP STRIP CRACKED BS 947<[01] RECEIVED NEW CAP STRIP; CAP STRIP WILL BE INSTALLED WITH FLOOR PNL ON <BR>TTG8Q00U8AF2;[02] VERIFIED COMPLETION CORRECTIVE ACTION 1 AND MEASUREMENT TABLE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFT CARGO BAY FLOOR PNL 140DF CAP STRIP CRACKED BS 947<[01] RECEIVED NEW CAP STRIP; CAP STRIP WILL BE INSTALLED WITH FLOOR PNL ON <BR>TTG8Q00U8AF2;[02] VERIFIED COMPLETION CORRECTIVE ACTION 1 AND MEASUREMENT TABLE.