What was found
L/H A/C BAY; STA. 663 ANGLE TO VAPOR BARRIER CRACKED AT FASTENER HOLE LBL-9<[01] REMOVED L/H A/C BAY; STA. 663 DAMAGED ANGLE IAW SRM 51-40-02.;[02] LOCATED AND DRILLED L/H A/C BAY; STA. 663 NEW ANGLE IAW SRM 51-40-02. OK TO INSTALL NEW ANGLE.;[03] VERIFIED LOCATED AND DRILLED HOLES IN REPAIR PARTS. OK TO INSTALL REPAIR PARTS.;[04] INSTALLED AND DOMED SEALED FASTENERS COMMON TO FUEL TANK ON UPPER CHORD PER SRM 51-40-02 AND AMM 51-31-00;[05] VERIFIED THE INSTALLATION AND DOME SEAL OF REPAIR FASTENERS COMMON TO FUEL TANK AT STA 663 PER SRM 51-40-02 AND AMM 51-31-00. (RII);[06] EXISTING FASTENER HOLES ON REPAIR AREA OF WING CENTER SECTION REAR SPAR VAPOR BARRIER REQUIRE NDT PER SRM 57-10-10-2R PARAGRAPH 4 C.;[07] REJECT CORRECTIVE ACTION ITEM #4 FOR INCORRECT REFERENCE. SEE FAULT TTG8Q00W8U5R FOR NEW WRITE-UP.;[08] ADDED JOB STOP REASON.;[09] RII INSPECTION C/W FOR CA #4. <BR>PROPER REFERENCE IS SRM 51-40-02 DUE TO ENTIRE PART BEING REPLACED INSTEAD OF CUT AND SPLICED.;[10] INSTALLED L/H A/C BAY; STA. 663 NEW ANGLE IAW SRM 51-40-02.;[11] RII INSPECTION C/W FOR CA #10;[12] PARTS UPDATE ONLY;[13] PARTS UPDATE ONLY;[14] TSR UPDATE